I believe that everyone will not be unfamiliar with water and ground heating. Water and ground heating is conducted from bottom to top through the heat storage of the ground itself and the upward radiation of heat, so as to achieve the purpose of heating. It will form a gradually decreasing temperature gradient from the sole of the feet to the head indoors, thus giving people a comfortable feeling of warm feet and cool head, which is in line with the fitness theory of "warm feet and cool top" in traditional Chinese medicine. The following editor will introduce the installation specifications of water and floor heating

I believe that everyone will not be unfamiliar with water and ground heating. Water and ground heating is conducted from bottom to top through the heat storage of the ground itself and the upward radiation of heat. It will form a gradually decreasing temperature gradient from the sole of the feet to the head indoors, thus giving people a comfortable feeling of warm feet and cool head, which is in line with traditional Chinese medicine “ Warm feet and cool top ” Fitness theory. The following editor will introduce the installation specifications of water and floor heating

installation specifications for water and ground heating I. preliminary installation

before formally paving ground facilities, we should first confirm the design drawings, clean the site, etc., and make preparations. Then install the temperature control line and sub collector. These processes are also very important, which involve slotting, assembly, etc. These are related to whether the ground heating can be used normally in the future, and must be installed correctly and standardized

installation specifications for water and ground heating II. Preparation work

installation preparation for ground heating: clean up the construction site after mobilization, and determine the installation location of the main machine (wall mounted boiler) and sub collector, so as to prepare for the subsequent construction

installation specifications for water and ground heating III. full installation

after burying the temperature control line and installing the sub collector to the designated position, you can start laying the ground insulation layer and heat supply pipeline. Although these parts seem not difficult, in fact, some of the small details are very important. For example, after the ground pipelines are laid, acceptance tests should also be carried out to ensure normal use

installation specifications for water and ground heating IV. laying insulation layer

cut the insulation board according to the actual size first, and then lay it. Leave space for the pipeline when laying. Lay insulation board first, and then lay reflective film. When laying, the insulation board must be tightly adhered, and the edges of the two reflective films must also be glued with adhesive tape. Then lay the steel wire mesh on it. The edges of the two steel wire meshes should be connected with special ties. Finally, the pipeline can be installed

installation specifications for water and ground heating v. laying pipes

in order to prevent heat loss, it is necessary to put a special insulation sleeve on the pipe from the water collector to the installation room. Connect the insulated pipe to the water distributor and collector, and connect one end of the pipe to its temperature control valve. When laying pipes, the corners of the pipes must be carefully tied with ties, and then fixed with special plastic cards to prevent loosening. After the pipe is paved, put this end of the pipe on and then transfer it back to the water distributor and fix it, so that all the pipes for floor heating are paved

installation specifications for water and ground heating VI. pressure test

inject cold water into the paved pipe. After the pipe is filled with water, use a special beater to inject 10kg pressure. After sealing for 24 hours, if the pressure of the pipeline at this time is not less than 6kg, it means that the pipeline has no leakage and can be used normally

editor's summary: that's all for the installation specifications of water and floor heating. I hope it will be helpful to you. If you want to know more about it, you can pay attention to the information